New drinking water production station for WMD drinking water
Seeking water production productivity improvements? Look no further, Batenburg Beenen delivers! 💧
The outdated WMD Drinking Water Production Station needed upgrading to meet stricter standards. Additionally, Vitens required more water in Terwisga due to drying in the area, hence a 16 km long pressure pipeline was installed.
This vast water station with a prolonged timeline is a complete new construction, making it unique. Many panels, measurements, and consumers needed connection. Providing a massive generator was also a distinct feature for Batenburg Beenen.
What are the project Benefits?
Efficient water extraction and purification. Enhanced and guaranteed water quality. The vacated site of the current production station will host a future solar panel field for self-sustained energy production.
Batenburg Industrial Automation
Every day, we focus on making our customers' production, cultivation and property operations smarter, more efficient, safer and more sustainable. We do this by supplying and installing smarter products and by designing high-quality software to control processes and systems. Think of digital twins, predictive maintenance and augmented and virtual reality solutions. In close cooperation with clients, partners, universities, colleges and research institutes, we make the latest technologies practical.